Tunnel Construction

Brenner Base Tunnel

Tunnel Construction

Burgholz Tunnel

The Burgholztunnel consists of two tubes approximately 1800 m long. Baresel AG Stuttgart, NL Tunnelbau and the G. Hinteregger & Söhne Baugesellschaft m.b.H., Salzburg were awarded the construction of this tunnel as a joint venture.