TILOS can be used in various industries to produce professional plans based on time distance diagrams >>>

Any area of the project can be printed in any size in professional quality. 

|
 |

TILOS is developed for planning and managing linear projects in civil engineering, like highways, rail-tracks, tunnels, pipelines and bridges.
The major enhancement is, that TILOS connects the geographic information of the construction site with the schedule, showing what is build when and where. CPM schedules and network diagrams are more analytical, but fail to provide a visual connection between the project plan and the project itself.
Each country has different names for this technique of planning:
- Linear Scheduling Method (LSM) -
- Time Distance Diagram -
- Time Location Diagram -
- French Diagram –
- March Chart -



In lack of existing software, these diagrams where done by drawing on paper, CAD systems or using Excel.
TILOS integrates the strength of computer calculated network into the linear scheduling method:
 | Full CPM analysis with display of critical path in Time-Distance diagram
|  | Full support of sub projects. Bridges, pump stations or others bar activities can be planned in a separate sub project and their major activities or milestones are linked to Time-Distance-Diagram.
|  | Full control over Quantities, work rates, resources and costs connected to location information.
|  | Perfect monitoring of progress along the production line. |

|
 |


TILOS6 contains a big set of new functionality to improve the usability. The main enhancements are in the area of modelling the distance axis (profiles and symbol library), task calculations, new diagrams along time and distance axis and a complete new progress concept. PDF-Broschure >>>


Click here to get more info on TILOS >>>.


Download a TILOS brochure as PDF to get more information about TILOS. >>>.


ASTA Development runs a special education programe to support schools and universities >>>. 
|